Moçâmedes Railway Incurs Significant Losses Due to Flood Damage
The Moçâmedes Railway (CFM) experienced losses of up to 160 million Kwanzas (approximately 190,704 USD) during the 31-day suspension of train services on the Huíla/Cuando Cubango section. This disruption was caused by heavy rains that washed away two hydraulic crossings. The floods on February 3rd and 4th severely impacted the railway infrastructure, destroying the hydraulic passage between the towns of Chanja and Olivença. Repair works, which took a month to
